#WO-24538
Boral
Job Details
Description
Equipment Mounting Pad
Unit
Unit 28
Stage
Ready to Weld
Due Date
01 Jun 2026
(overdue)
Material
Black Pipe DN80
Quantity
2
Notes
Tabs added per drawing rev B
Metal Breakdown
| Item | Qty | Unit | Weight (kg) |
|---|---|---|---|
| Black Pipe DN80 | 2 | pcs | 4.3 |
| Weld consumables | 0.1 | kg | — |